- Update certain electrical outlets throughout the house - done, 4/1
- Change all electrical outlets ourselves to new 3-prong
- Paint ceilings in all rooms - done
Living room
- Pulloff wallboard, mud, prime - done
- Build bookcase/tv cabinet (Michael) - done
- Paint " " - done
- Sand, refinish LR floors - done
- Move light fixture over dining area - done
- Buy light fixture for dining area - yeah! done
- Paint ceiling - done
- Re-attach trim - done
- Paint trim - done
- Replace picture window with doors to patio, or special windows..? - not happening
Hallway
- Pull off wallboard, mud, prime, spackle, attach metal corner - done
- Paint walls - done
- Caulk ceiling and trim joint, repaint - done
- Re-attach trim, prime - done
- Paint trim - done
- Install new light fixture - done, finally
Bedroom 1 (Ray's office/quest room)
- Prime wallpaper, prime closet for bookcase - done
- Paint walls and trim - done
- Replace carpet - carpet ordered 4/16, LaValley's, still waiting, done 5/10
- Paint celings - done
Bedroom 2 (Master)
- Sand, refinish floors - 4/19-22, done
- Prime wallpaper - done
- Paint walls - done
- Paint trim - done
- 1/4 round moulding for floor - not doing
- fix baseboard - done (thanks, Dad)
Bedroom 3 (Ellen's office)
- Prime wallpaper - done
- Paint walls - done
- Replace closet door
- Paint trim - done
- Replace light - done, by Ellen successfully (and with a dampened brow)!
Bathroom
- Replace toilet seat - done
- Replace hardware on cabinets - done
- Install pedestal sink?
- Replace light
- Paint - done
- Floor (with kitchen) - done
Kitchen
- Paint Walls - done
- Move dishwasher - done
- Build/buy corner cabinet - Michael building, done 4/27
- Order counter - ordered, 4/16, need to reorder, delivery 5/12, done
- Replace faucet - done
- Replace two overhead lights - done
- Install under cabinet lighting - done
- Install flooring - done ! 7/3 !
Laundry/utility room - (Fall '05)
- Replace floor?
- Remove tiny, utility sink
- Install bench in its place
- Sand, prep walls (?)
- Paint walls (?)
Gardens, grounds, outdoors
- Start tomato seeds - done 3/30
- Start flower seeds - done
- Install privacy fence on lefthand side of yard - done 7-8/05
- Install window boxes - done
- Install motion detector and garage light - done 8/05
- Install stone patio (fall 05? after the 3 weeks of rain?) - done 11/05
- Expand vegetable garden - done
- Re-seed sections of lawn - done
- Fertilize with lime/organic - ongoing...